Clark engineers
Menu
About Us
John Clark
Reports
Services
Analysis
Design
Foundations
Forensic Analysis
Structural Testing
Inspections
Expert Witness
Blast resistant structures
Projects
Case Histories
Clients
Careers
Contact Us
Home
–
Projects
–
Case Histories
CASE HISTORIES
Catastrophic Tank Failure Case History
Failed Bulkhead
Steel Treehouse
Sagging Roof Trusses
FRP Wet Wells
Shipping Container Structures
Manufacturing Plant Structures
AC Stand
Bomb Shelter Failure
Bulkhead Failures
Buried Structures
Burner stack
Cascade Wetwell
Cement Silo
Cone Bottom Tanks
Crane Hook
Crane Stairs
Custom Software
Encoder PTM
FEA of FRP tank
Floating Coffer dam
Framing Errors
FRP Liner For Sewer
FRP Stack Foundation
FRP UST Failure
Gantry
Horizontal FRP
HPDE Plastic Tank
Hydro Tester
Inspection Tables
Large Steel Heaters
Manufacturing Plant Structures
Nozzle Load Analysis
Oxidizer Vessel
Petro Chemical Structures
Phosphate Tables
Pipe Loader
Pipe Straightener
Plant Plan
Prefabricated Stairs
Pressure Vessel
Pump Generator Support
Rectangular Scrubbers
Redesign Steel Building
Segmented Retaining Walls
Shipping Container Structures
Skid With Equipment
Sliding Table
Slitter Chute
Soil Installation Study
Soldier Piers
Spool Design
Steel Dish Bottom Tank
Steel Hopper
Steel Stack
Steel Structure
Storage Tanks
Substation Upgrade
Suspended EEC
Swimming Pools
Tank Rotation Scheme
Underground Metering Station
Vertical Scrubber Tanks
Vibration
Water Gun
Zipline Foundation